The Municipality of Concordia carried out an important intervention on Hermana Clara street in Villa Zorraquin, within the framework of the road improvement program with the collaboration of local residents.
The human resources, machinery, and gravel were provided by the Municipality, while the residents contributed the cement, consolidating the joint work between the municipality and the community.
Mayor Francisco Azcué toured the work, where he reaffirmed the administration's commitment to continue generating public policies that allow for the execution of works that improve the quality of life of the residents of Concordia. “We are currently executing an infrastructure plan for 1.5 billion pesos with our own resources, but also, through dialogue with the residents, these types of interventions can be carried out.”
“It is important to talk, to listen to them. While we tour the work, they also raise other needs that we receive in order to provide them with an answer. Here, a consolidated repair is being done, with good materials, and that is where we are investing our resources.”
Roadway restoration work was carried out in the sector comprised of Gualeguay and Monseñor Rösch streets, which included the rectification of gutters; the filling and shaping of the roadway with material from the municipal quarry; placement of a gravel surface layer of crushed basaltic stone shaped in the municipal quarry, verifying laboratory tests at the Directorate of Road Works and Maintenance. In addition, stabilization with cement in the last centimeters of the surface layer and compaction until reaching optimal densities.
The human resources, machinery, and gravel were provided by the Municipality, while the residents contributed the cement, consolidating the joint work between the municipality and the community.
Mayor Francisco Azcué toured the work, where he reaffirmed the administration's commitment to continue generating public policies that allow for the execution of works that improve the quality of life of the residents of Concordia. “We are currently executing an infrastructure plan for 1.5 billion pesos with our own resources, but also, through dialogue with the residents, these types of interventions can be carried out.”
“It is important to talk, to listen to them. While we tour the work, they also raise other needs that we receive in order to provide them with an answer. Here, a consolidated repair is being done, with good materials, and that is where we are investing our resources.”
Roadway restoration work was carried out in the sector comprised of Gualeguay and Monseñor Rösch streets, which included the rectification of gutters; the filling and shaping of the roadway with material from the municipal quarry; placement of a gravel surface layer of crushed basaltic stone shaped in the municipal quarry, verifying laboratory tests at the Directorate of Road Works and Maintenance. In addition, stabilization with cement in the last centimeters of the surface layer and compaction until reaching optimal densities.
