The Municipality of Concordia, through the Secretariat of Urban Development, continues today, Monday, May 13, with the program for the repair of unpaved streets, as well as pothole patching and drain cleaning in different sectors and neighborhoods of the city.
The sectors where work will be carried out during the day are as follows:
Parque Rio Uruguay Neighborhood: Repair of Batalla de Cepeda, Mayor Quinteros, and Magariños streets.
Villa Zorraquín: Grading and repair of streets used by bus lines; Osvaldo Magnasco, Chacho Peñaloza, and Ortiz.
La Roca Neighborhood: Grading and repair of 2 de Abril, Coronel Navarro Este and Oeste, España, and Grimber streets.
Parque Neighborhood: Transport of gravel, repair of J.J. Valle Street, between Villaguay Este and Odear.
Villa Adela Oeste: Grading and repair of Luis A. Ponti, Palmiro Castanino, Los Robles streets, and cross streets.
Chabrillón Street, between Pública and the river.
Opening and compaction of concrete potholes at: Alvear 440, Sarmiento 60, Ituzaingó between Rawson and San Lorenzo, Las Heras and Tala, Espejo and P. Del Castillo, Catamarca and P. Del Castillo, Rivadavia between Coldaroli and Liniers
Opening and compaction of asphalt potholes at: Moulins and Tavella towards the east; Moulins near Laprida.
Installation of a grate on Humberto Primo to the west near Balcarce.
Cold asphalt patching on routes: Tavella up to the tracks. Starting at Route 4 from Tavella to the west.
The sectors where work will be carried out during the day are as follows:
Parque Rio Uruguay Neighborhood: Repair of Batalla de Cepeda, Mayor Quinteros, and Magariños streets.
Villa Zorraquín: Grading and repair of streets used by bus lines; Osvaldo Magnasco, Chacho Peñaloza, and Ortiz.
La Roca Neighborhood: Grading and repair of 2 de Abril, Coronel Navarro Este and Oeste, España, and Grimber streets.
Parque Neighborhood: Transport of gravel, repair of J.J. Valle Street, between Villaguay Este and Odear.
Villa Adela Oeste: Grading and repair of Luis A. Ponti, Palmiro Castanino, Los Robles streets, and cross streets.
Chabrillón Street, between Pública and the river.
Opening and compaction of concrete potholes at: Alvear 440, Sarmiento 60, Ituzaingó between Rawson and San Lorenzo, Las Heras and Tala, Espejo and P. Del Castillo, Catamarca and P. Del Castillo, Rivadavia between Coldaroli and Liniers
Opening and compaction of asphalt potholes at: Moulins and Tavella towards the east; Moulins near Laprida.
Installation of a grate on Humberto Primo to the west near Balcarce.
Cold asphalt patching on routes: Tavella up to the tracks. Starting at Route 4 from Tavella to the west.